The middle portion of the road closes for construction at 6:00 am on Mondays and remains closed through 8:30 pm on Fridays. Expect minor delays due to one-lane traffic when open and rough road conditions. The middle portion of Stevens Canyon Road from Stevens Creek to Grove of the Patriarchs is OPEN with weekend & holiday access ONLY due to construction for the 2023 season. OPEN from Paradise Road wye on the west side to Stevens Creek, with access to Reflection Lakes and Bench & Snow Lake Trailhead. The Eastside and Silver Falls Trails are open. NOTE: The Grove of the Patriarchs vault toilets are open but the Grove of the Patriarchs trail remains closed. OPEN from Stevens Canyon Entrance on the east side to the Grove of the Patriarchs parking area. One-way scenic route leaving Paradise connecting to Stevens Canyon Road.Įstimated to open for the season June 30, weather dependent. NOTE: Most of this road is gravel and some sections have rough conditions with potholes. North Entrance to SR123/Cayuse Pass then east to Chinook PassĮstimated to open for the season July 7, weather dependent. of Transportation (WSDOT) or call 1-800-695-ROAD (7623) toll-free statewide or 206-DOT-HIWY (368-4499) in the greater Seattle area.Ĭommercial vehicles prohibited at all times. No vehicles are permitted beyond the park entrance.įor more information, check the Washington State Dept. NOTE: Be prepared to navigate around road and trail washouts and expect to encounter normal hazards, including downed trees, snow, and changing weather conditions. Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.OPEN to pedestrian & bicycling traffic only Heating, Ventilating, and Air Conditioning (HVAC).Įlectrical, Lighting, Interior Lighting, Exterior Lighting.Įlectronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.Įxterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses. Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware. Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection. Wood, Plastics, and Composites, Rough Carpentry. *The owner requests that all subcontractor / supplier inquiries be directed to the GC Bidder.ģ Stories, 1 Story Below Grade, 98,600 SF.Ĭoncrete, Concrete Forming and Accessories, Cast-in-Place Concrete. Scope of work includes but is not limited to: Job Trailer, Temp Fencing, Temp Toilet, Final Cleaning, Construction Staking, Directional Boring, Dewatering, Traffic Control, Shoring, Concrete Detention Vault, Stripe/Sign/Wheel Stop, Extruded Curb, Fencing, Landscape, Site Concrete, Building Foundation/SOG, Sealed Concrete, Masonry, Steel Fabrication, Waterproofing, Insulation: Simple Saver PEMB, Door, Frame, Hardware, Overhead Door, Storefront, GWB & Metal Stud Framing, Acoustical Ceiling, Flooring, Paint, Restroom Accessories, Fire Extinguisher & Cabinet, Signage, Casework, PEMB, Storage Corridor, Unit Coiling Doors, Etc., Elevator, Plumbing, HVAC, Fire Sprinkler, Electrical, Data/Communications, Access Control, CCTV & Security, Two-Way Communication, DAS System: Emergency Responder Radio, Fire Alarm. New construction of a 4-level storage facility with a manager's office. New Construction, Infrastructure - 95,000 SF Port of Port Angeles Marine Trades Center Building Design
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |